Home / Business / Outdoor Heat-Stress Monitoring

Solution

Outdoor Heat-Stress Monitoring

For construction sites, roadworks, utility maintenance and outdoor inspection. When a worker's heat-stress risk rises, the watch vibrates to alert them first, the crew lead is notified and logs the response, and a red alert left unhandled automatically notifies the safety manager. A record is generated at the end of every shift, ready to show as evidence that your heat-hazard prevention plan is carried out.

Coming soon. Construction-site pilots start in spring 2027. Pilot places are limited.

Why now

  • From July 1, 2026, Taiwan's amended Occupational Safety and Health Act is in force. Employers who fail to take necessary protective measures can be fined NT$50,000 to NT$3 million.
  • High-temperature work risk is now part of contractor safety management: the principal contractor and every tier of subcontractor must jointly identify heat risks and put protective measures in place.
  • Since June 1, 2026, the Ministry of Labor has run special inspections of outdoor high-temperature work, focusing on construction and road repair.
  • Sites built of steel and concrete store heat, so on-site temperatures are often higher than the weather forecast. Forecasts and manual patrols alone make it hard to spot a worker who is unwell in time.
Illustrative scenario

A day on site

A July day at a 6-storey residential construction site: the heat index climbs from level 1 in the morning to level 3 after lunch, and the rebar area in direct sun is raised one more level.

Site
6-storey RC residential building
Workers
6 in-house, 6 from 2 subcontractors
Work
July, 07:00–17:00
Plan
Seasonal rental, 12 watches

Before

  • Heat index checked by hand and passed on by word of mouth.
  • The main contractor cannot see how subcontractor workers are doing.
  • No daily records to show during labour inspections.

Modules in this scenario

  • Outdoor Heat-Stress Monitoring
  • Maintenance Service (watch issue, return and training)
  • Remote Monitoring (site entrance, optional)

This scenario is written around common needs in construction. The site, people, times and figures are illustrative, not results from a specific customer.

Three jobs the system takes on

Alert the wearer first

During work hours the watch checks heat-stress risk on three levels: yellow, orange and red. When the risk rises it vibrates and shows a reminder to drink water or rest. This step happens on the watch and needs no network.

Crew leads see who needs a break

Workers at higher risk appear as a notification on the crew lead's phone. After acting, the lead taps rest, water, move to shade or medical care, and the time is logged. Once the worker has recovered, the alert is cleared only after the crew lead confirms how they are.

Records ready for inspections

A heat-stress management record is generated at the end of each shift (PDF and CSV): the day's heat index, each worker's alerts and response times, skin-temperature changes and any unhandled events. It can serve as the record of health management and emergency response under your heat-hazard prevention plan.

How alerts are decided

LevelWhen it triggersWearerCrew leadSafety manager
Yellow, cautionWatch detects level 1 riskVibration, reminder to drink waterApp notificationShown on dashboard
Orange, warningWatch detects level 2 riskStrong vibration, reminder to restPush notification, response requiredLINE notification
Red, emergencyWatch detects level 3 risk, or an orange alert left unhandled for 10 minutesContinuous vibrationPhone callPhone call, emergency contact notified

Earlier escalation based on site conditions:

Alert thresholds and escalation rules can be adjusted for each site, and the actual values are calibrated during the pilot.

How it works

Watch (detects risk, vibrates) → crew lead app (receives via Bluetooth, lists workers who need a break) → cloud backend (heat index, alert rules, records) → safety manager (dashboard, LINE, phone)

How it maps to the rules

Under Taiwan's Ministry of Labor heat-hazard guideline, employers look up the heat index from local temperature and humidity and act on four risk levels. Select a level to see what is required and how the system helps.

Rules and guideline

    How the system helps

      Key regulations

      Taiwan · added 1 Aug 2024

      Occupational Safety and Health Facilities Rules, Art. 303-1

      When outdoor heat-hazard risk reaches level 4, employers must provide shade, cooling equipment, a nearby rest area and enough drinking water.

      System support: At level 4 a facility checklist is pushed and the results go into the daily record.

      Taiwan · in force

      Facilities Rules, Art. 324-6

      For outdoor work, employers must take measures according to the weather, including:

      • Lower site temperature and provide a shaded rest area
      • Provide drinks or salt water and adjust working hours
      • Patrol more often and manage worker health
      • Support acclimatisation and watch workers' condition
      • Train workers and set up emergency reporting and response

      System support: Live status replaces manual checks, with rules for new workers and automatic red-alert reporting.

      Taiwan · 3rd edition, 20 Jun 2025

      Heat-hazard prevention guideline

      Look up the heat index from local data, act on the risk level, raise one level for direct sun or impermeable clothing, and keep a heat-hazard prevention plan. Applies to all workers, including the self-employed and agency staff.

      System support: Heat index is fetched for the site address and levels are raised automatically; daily records show the plan is carried out.

      Taiwan · in force 1 Jul 2026

      Amended Occupational Safety and Health Act: contractor management

      Risk assessment and hazard notice before contracting out; entry checks and records for equipment and workers in joint operations; owners must name one lead contractor when several work on site.

      System support: Subcontractor workers are logged at check-in, and the main contractor sees every crew on one board.

      Japan · in force 1 Jun 2025

      Amended Industrial Safety and Health Regulations (Japan)

      For work expected to run 1 hour continuously or over 4 hours a day at WBGT 28 or 31°C and above, employers must set up a reporting system, prepare response procedures and inform workers.

      System support: Reporting runs through the crew lead app and automatic calls; responses are logged by alert level.

      Taiwan's Ministry of Labor runs outdoor heat inspections in summer (from June 1 in 2026), focusing on construction and road works. Failing to provide shade, cooling and rest facilities at level 4 can be fined without a prior correction notice. Under the amended Occupational Safety and Health Act in force from July 1, 2026, employers who fail to take necessary protective measures can be fined NT$50,000 to NT$3 million.

      This summary is based on public government information (November 2026). It is for reference only and is not legal advice. Using this system to keep records does not by itself mean all legal duties are met.

      Sources:勞動部:戶外作業熱危害新規定(第 303 條之 1)|勞動部:修正高氣溫作業熱危害預防指引(2025/6/20)|勞動部:職安法新修條文 2026/7/1 上路|職安署 高氣溫作業防護資訊網|厚生労働省:職場における熱中症対策の強化(令和7年6月1日施行)

      What the site needs

      No major installation work. There are two setups, depending on crew size:

      SetupSuited toOn-site equipment
      Phone relayEach crew lead with 5 to 6 workers in a compact areaOne watch per worker, crew lead's phone with the app, a power bank
      Gateway30 or more workers, spread out, steel-frame floors or basementsOne watch per worker, one Bluetooth-to-4G gateway per work zone (site power needed), crew lead's phone

      Both setups include a central charging station for the site office, spare watches and QR labels on the watch backs. An on-site temperature and humidity sensor can be added so the heat index is calculated from readings on site.

      Wearers do not need a smartphone.

      Suitable sites

      SiteTypical settingRecommended approach
      Construction siteFixed site, several subcontractors, high floors and basementsPilot with phone relay, switch to gateways to scale up; principal contractor sees every subcontractor
      Roadworks, utility maintenanceMoves along a route, new work zone each dayPhone relay with the crew lead's phone kept in the work vehicle; heat index taken from the day's work zone
      Lone work (inspection, field work)One person, changing locationsApp installed on the worker's own phone; with no crew lead, orange alerts go straight to the manager
      Short-term workA few days to a few weeksPilot plan, equipment returned at the end

      Contractor management

      • Principal-contractor accounts can see alerts and response records for every subcontractor crew
      • Subcontractors see only their own workers
      • Day labourers and temporary workers scan the QR code on the watch back before work starts, and all assignments are cleared with one tap at the end of the shift

      Specifications and data principles

      • Watch: three-level heat-stress risk detection, skin temperature, 3-axis motion sensor, vibration alerts, Bluetooth connection
      • Data is uploaded only during work hours and stops after the shift; movement is not tracked
      • Accounts have role-based permissions, and every view and change is logged
      • Monitoring data is never used for appraisals or discipline, and this is written into the service contract
      • Final specifications depend on the pilot version and quotation

      Plans

      Pilot

      One site, 5 watches, 30 days, with on-site training and a usage report. The fee can be credited against the setup fee when you sign a full contract.

      Seasonal rental

      Priced by headcount and working months. Includes watches, platform, charging stations and replacement of faulty units. Equipment is returned at the end of the hot season.

      Long-term partnership

      Multiple sites; watches can be rented or bought, with contractor management and quarterly reviews.

      How a 30-day pilot runs

      1. Week 1

        Site survey

        Location, headcount, subcontractors and connectivity

      2. Week 1

        Issue and training

        Watches issued, crew lead app installed, 30-minute briefing on site

      3. Weeks 2–4

        In use

        Daily records generated automatically, weekly review of alerts

      4. Week 5

        Pilot report

        Usage report, then choose seasonal rental or long-term rollout

      Subsidy

      The Ministry of Labor's subsidy for improving safety and health facilities and equipment now covers heat-hazard technology equipment, such as heat-hazard detection and warning devices. The subsidy rate and cap depend on the size of the business. The 2027 schedule and conditions will follow the Ministry's announcement, and we can help prepare the application documents.

      FAQ

      Important notes

      Other modules